The turing basin for the Saigon Port Comples. Picture taken from the command Q-Boat


A Heavy Truck at Newport LST Ramp. Belonged to the Engineers.


Rice paddies acros the river from the Newport Piers. Taken from the top of a ship being worked. The hook is from Big John.


Large tug, LT1952 used to berth vessels.


A hold full of beer.


The pier is full of lumber, a very pilferable commodity.


The day the "Seatrain Washington" broke loose and blocked the channel




Hospital ship at Danang


Empty Hold showing hatch covers and winches.